---
title: "L.A. Fuller & Sons Case Study | Pelles AI"
description: "How L.A. Fuller & Sons, a third-generation heavy civil contractor, handed two to four days of plan and spec reading per bid to Pelles agents — getting about 18 hours back on every bid."
canonical: https://www.pelles.ai/la-fuller-case-study
---

Customer Case Study

L.A. Fuller & Sons × Pelles AI

# How L.A. Fuller & Sons stopped leaving specs unread

Every Fuller & Sons bid now starts with a complete read of the plans and specs, done by Pelles agents, so estimators spend their time estimating.

Download the case study Heavy Civil

2–4 days Manual plan and spec reading per bid, before Pelles

<5 min Full bid/no-bid assessment from the Bid Risk Analyzer

\~18 hrs Returned to the estimator on every bid, on average

> “The use of Pelles has increased the efficiency and accuracy of our estimating team tremendously. The time we used to spend on researching the project is now spent on analysis and strategy providing more thorough and accurate estimates.”
>
> **Josh Fuller** President, L.A. Fuller & Sons

Company Profile

| Company               | L.A. Fuller & Sons Construction, Ltd.                                              |
| --------------------- | ---------------------------------------------------------------------------------- |
| Industry              | Heavy civil: bridges, paving, earthwork, underground utilities and site demolition |
| Company Size          | Mid-size                                                                           |
| Headquarters          | Amarillo, TX                                                                       |
| Service Area          | Texas                                                                              |
| Teams using Pelles    | Estimating, field and project management                                           |
| Pelles customer since | 2024                                                                               |

The Challenge

## Two to four days per package, if the calendar allowed

A heavy civil bid arrives as a plan set, a specification set, a geotechnical report, addenda and a contract: hundreds of pages that all have to agree with each other before a number goes out the door. At Fuller & Sons, an estimator worked through that stack by hand, hunting keywords and section numbers.

- Slow, and capped by the calendar. Reading one package took an average of two to four days, and only went as far as the bid date allowed.
- Specs went unread. The sheer volume of information meant some sections never got opened before bid day.
- Holes surfaced after signing. An incomplete read produces a bid with a hole in it: a subsidiary item priced twice, a bedding detail missed, a spec section nobody opened. The hole shows up only once the contract is signed.
- The filing system was never the problem. Every document lives on Fuller’s internal server, under conventions the company set long ago. The archive was organized. It was simply larger than the hours available to read it.

## Read the full case study

How Fuller & Sons made a full read of every bid package, standardized workflows, and its own Bid Risk Analyzer agent a step in the project checklist — and what changed as a result.

Download PDF
